Floating production system

FPSO Dalia
Customer Total
Classification: B.V.
3 TPK Deck mounted Boilers 35 MW
Complete re-tubing of evaporation elements
Complete renewal of back wall
Gas outlet boxes, insulation and cladding
100% x ray.
All materials supplied by TPK

FPSO ULLCC BW Nisa, 323000dwt
Customer BW Offshore
Classification : ABS
2 x 75 t/h - 60 bar main boilers including super heaters
Complete re-tubing including super heater, upgrade to T22 materials
Condition assessment of the main components-water and steam drum,
Headers, down comers, feeder pipes etc.
Erection of new gas house for Gas and Crude Oil firing
Removal of existing economizer and de-aerator, new one design and build by TPK.
New control panel, burners, feed water pumps, FD fan controls, transmitters, cables to be supplied and installed.